Mission Reports

Stacking complete for SLS boosters

The twin 177-foot-tall solid-fueled boosters for the first flight of NASA’s Space Launch System have been stacked inside the Vehicle Assembly Building at the Kennedy Space Center to await arrival of the rocket’s cryogenic core stage, which is set for a second engine test on a firing stand in Mississippi later this month.

Mission Reports

Hydraulic system issue triggered early engine shutdown during SLS test-firing

NASA officials said Tuesday the weekend test-firing of the Space Launch System moon rocket’s core stage was cut short by an out-of-limits parameter in a hydraulic system for gimbaling, or vectoring, one of its engines. NASA Administrator Jim Bridenstine told Spaceflight Now engineers are “feeling pretty good” about the data gathered during the shortened test-firing, and managers may decide to ship the SLS core stage to the Kennedy Space Center for launch preparations without re-attempting the planned eight-minute hot fire.