
Kennedy Space Center








Stacking complete for SLS boosters
The twin 177-foot-tall solid-fueled boosters for the first flight of NASA’s Space Launch System have been stacked inside the Vehicle Assembly Building at the Kennedy Space Center to await arrival of the rocket’s cryogenic core stage, which is set for a second engine test on a firing stand in Mississippi later this month.

Next Crew Dragon launch set for April 22
NASA and SpaceX have set April 22 as the target launch date for the next Crew Dragon flight to the International Space Station. The four-person crew will be the first to ride a previously-flown Falcon 9 booster and a reused Dragon spacecraft, and a NASA official said this week that the launcher and capsule are in “really good shape” as refurbishment wraps up at Cape Canaveral.

SpaceX sticks 75th Falcon rocket landing after launching 60 more Starlink satellites
Launching through a blanket of low-hanging clouds and light mist, a SpaceX Falcon 9 rocket thundered into the sky over Florida’s Space Coast early Thursday and delivered 60 more Starlink internet satellites to orbit. The rocket’s first stage touched down on SpaceX’s floating landing platform in the Atlantic Ocean to complete its eighth trip to space and back.