Related Articles
Hydraulic system issue triggered early engine shutdown during SLS test-firing
NASA officials said Tuesday the weekend test-firing of the Space Launch System moon rocket’s core stage was cut short by an out-of-limits parameter in a hydraulic system for gimbaling, or vectoring, one of its engines. NASA Administrator Jim Bridenstine told Spaceflight Now engineers are “feeling pretty good” about the data gathered during the shortened test-firing, and managers may decide to ship the SLS core stage to the Kennedy Space Center for launch preparations without re-attempting the planned eight-minute hot fire.
Live coverage: Next SpaceX launch expected no earlier than Monday
SpaceX performed a hold-down test-firing Jan. 20 of a Falcon 9 rocket at Cape Canaveral in preparation for a launch with 60 Starlink broadband satellites, but officials delayed the missions’s planned launch Tuesday due to extreme weather in the downrange recovery zone for the first stage and payload fairing. The next possible launch attempt is expected at 9:49 a.m. EST (1449 GMT) Monday.