January 2, 2026
Spaceflight Now
  • Home
  • News Archive
  • Launch Schedule
  • Mission Reports
    • Antares Launcher
    • Ariane 5
    • Atlas 5
    • Delta 4
    • Falcon 9
    • Falcon Heavy
    • H-2A
    • Soyuz
    • Space Station
  • Members
    • Sign in
    • Become a member
    • Members Content
  • Live
  • Shop
Breaking News
  • [ December 27, 2025 ] Launch pad issue delays again Falcon 9 launch of Italian Earth observation satellite Falcon 9
  • [ December 26, 2025 ] Former ULA president and CEO Tory Bruno joins Blue Origin News
  • [ December 22, 2025 ] H3 rocket suffers upper stage anomaly, fails to correctly deploy navigation satellite H3
  • [ December 22, 2025 ] Tory Bruno steps down as President, CEO of ULA News
  • [ December 21, 2025 ] Astronauts, launch teams practice Artemis 2 countdown Artemis

Video: Delta 4-Heavy tower rollback

December 4, 2014 Justin Ray

The mobile service tower is retracted from the Delta 4-Heavy rocket and Orion spacecraft for Exploration Flight Test 1.

  • Delta 369
  • EFT-1
  • Orion

Related Articles

Delta 4

John Grunsfeld speaks about Orion’s science goals

December 4, 2014 Stephen Clark

John Grunsfeld, Associate Administrator for the Science Mission Directorate at NASA Headquarters, speaks about the EFT-1 test flight and science opportunities made possible by the Orion capsule and its Space Launch System rocket.

News

Redesign likely needed for Orion airbag system

January 19, 2015 Stephen Clark

Engineers plan to redesign part of the Orion capsule’s self-righting flotation system that only partially engaged as the spacecraft splashed down in the Pacific Ocean following an orbital test flight in December, NASA officials said.

Mission Reports

Hydraulic system issue triggered early engine shutdown during SLS test-firing

January 19, 2021 Stephen Clark

NASA officials said Tuesday the weekend test-firing of the Space Launch System moon rocket’s core stage was cut short by an out-of-limits parameter in a hydraulic system for gimbaling, or vectoring, one of its engines. NASA Administrator Jim Bridenstine told Spaceflight Now engineers are “feeling pretty good” about the data gathered during the shortened test-firing, and managers may decide to ship the SLS core stage to the Kennedy Space Center for launch preparations without re-attempting the planned eight-minute hot fire.

News Headlines

  • Launch pad issue delays again Falcon 9 launch of Italian Earth observation satellite
    December 27, 2025
  • Former ULA president and CEO Tory Bruno joins Blue Origin
    December 26, 2025
  • H3 rocket suffers upper stage anomaly, fails to correctly deploy navigation satellite
    December 22, 2025
  • Tory Bruno steps down as President, CEO of ULA
    December 22, 2025
  • Astronauts, launch teams practice Artemis 2 countdown
    December 21, 2025
  • Space Development Agency awards roughly $3.5 billion to 4 companies for 72 missile tracking and warning satellites
    December 20, 2025
  • Rocket Lab launches 4 novel DiskSat satellites for U.S. Space Force, NASA
    December 18, 2025
  • Senate confirms Jared Isaacman as 15th NASA Administrator
    December 18, 2025
  • SpaceX flies Starlink mission using Falcon 9 booster flying for a 30th time
    December 17, 2025
  • SpaceX launches Wednesday morning Starlink mission from Kennedy Space Center
    December 16, 2025
  • Home
  • News Archive
  • Launch Schedule
  • Mission Reports
    • Antares Launcher
    • Ariane 5
    • Atlas 5
    • Delta 4
    • Falcon 9
    • Falcon Heavy
    • H-2A
    • Soyuz
    • Space Station
  • Members
    • Sign in
    • Become a member
    • Members Content
  • Live
  • Shop

© 1999-2025 Spaceflight Now Inc