Solar Orbiter
Atlas 5 for Solar Orbiter launch returns to assembly building for inspections
United Launch Alliance moved its next Atlas 5 rocket off its Florida launch pad Wednesday for inspections after a cooling duct unexpectedly disconnected before a planned countdown rehearsal to prepare for liftoff next month with the joint U.S.-European Solar Orbiter mission. The roll back to the Vertical Integration Facility at Cape Canaveral’s Complex 41 launch pad could delay Solar Orbiter’s liftoff, which was scheduled for Feb. 5
British-built solar probe shipping to Florida launch site before Brexit deadline
The European Space Agency’s Solar Orbiter spacecraft — assembled in Britain and set for liftoff in February — has completed environmental testing in Germany and is scheduled to ride a cargo plane to NASA’s Kennedy Space Center in Florida to begin launch preparations Oct. 31, several weeks earlier than planned to avoid complications stemming from Brexit.