
Doug Hurley



Bridenstine says Crew Dragon could launch with astronauts at end of May
NASA Administrator Jim Bridenstine says he is “fairly confident” that astronauts can fly to the International Space Station aboard SpaceX’s Crew Dragon spaceship at the end of May or early June, pending final parachute tests, data reviews and a training schedule that can escape major impacts from the coronavirus pandemic.



Crew training continues for SpaceX’s first launch with astronauts
During a visit to Cape Canaveral this week, NASA astronauts Doug Hurley and Bob Behnken strapped in to the SpaceX crew capsule they will ride into orbit as soon as mid-to-late May. Next week, the astronauts will be in Houston to continue training for an extended stay on the International Space Station that could last two-to-three months.


Pending test outcomes, NASA says SpaceX could launch astronauts in early March
A NASA official said Friday that SpaceX’s Crew Dragon spacecraft could be ready to ferry astronauts Doug Hurley and Bob Behnken to the International Space Station as soon as early March, pending the results from a major demonstration of the ship’s launch abort system this weekend, a pair of parachute drop tests, and space station crew schedules.

SpaceX abort test serves as practice run for astronauts, rescue teams
A SpaceX Falcon 9 rocket and Crew Dragon capsule were raised vertical at launch pad 39A in Florida late Thursday, setting the stage for a launch day dress rehearsal Friday with NASA astronauts Doug Hurley and Bob Behnken — the veteran space fliers assigned to the Crew Dragon’s first piloted mission later this year — before a critical in-flight test of the ship’s emergency escape system Saturday.

After redesigns, the finish line is in sight for SpaceX’s Crew Dragon spaceship
Five-and-a-half years ago, SpaceX founder Elon Musk revealed SpaceX’s Crew Dragon spacecraft, a sleek-looking human-rated spaceship with 3D-printed engines, a roomy stylized interior and touchscreen controls. Now SpaceX’s first ship to ferry astronauts — with numerous design changes introduced since 2014 — is about to leave the company’s factory for final testing before launching early next year.