NASA flight director Mike Sarafin describes the timeline of Orion Exploration Flight Test 1, the crew capsule’s first space mission set for launch Dec. 4 on a United Launch Alliance Delta 4-Heavy rocket. The test flight will verify the craft’s heat shield, computers and avionics, and key separation events to be used on piloted missions to deep space.
Related Articles
Live coverage: SLS core stage engines shut down early during critical hotfire test
A critical test-firing of the Space Launch System’s core stage engines cut off about a minute into a planned eight-minute burn Saturday on a test stand at NASA’s Stennis Space Center in Mississippi. The rocket’s four engines ignited at 5:27 p.m. EST (2227 GMT) for a test that was to pave the way for the core stage’s shipment to the Kennedy Space Center for launch preparations.
Soyuz crew docks with space station; Pence reaffirms commitment to moon missions
Fifty years to the day after Neil Armstrong stepped onto the surface of the moon, a NASA astronaut, an Italian flight engineer and a Russian commander blasted off from Kazakhstan Saturday aboard a Soyuz spacecraft, chased down the International Space Station and glided in for a picture-perfect docking.
Photos: Launch pad gantry retracted from Delta 4 rocket
The 330-foot-tall mobile service tower is rolled away from the United Launch Alliance Delta 4 rocket at Cape Canaveral’s pad 37B in the hours before the scheduled liftoff. The 9-million-pound gantry was retracted the length of a football field in preparation for launch of the Air Force’s WGS 9 communications satellite into Earth orbit.