The 330-foot tall mobile service tower has been retracted from the Delta 4-Heavy rocket at Cape Canaveral’s pad 37B for tomorrow morning’s launch that will place the Orion spacecraft on its intended trajectory.
Related Articles
Facing more delays, NASA opens door to launching lunar mission with commercial rockets
In a major shift, NASA is considering using two commercial launchers to send an unpiloted Orion crew capsule and its European-built service module on a test flight around the moon next year, maintaining the lunar test flight’s schedule despite fresh delays in the development of the multibillion-dollar Space Launch System that jeopardize the heavy-lifter’s 2020 inaugural flight, the agency’s administrator said in a congressional hearing Wednesday.
SLS mobile launch platform to go on the move this week
Live coverage: SLS core stage engines shut down early during critical hotfire test
A critical test-firing of the Space Launch System’s core stage engines cut off about a minute into a planned eight-minute burn Saturday on a test stand at NASA’s Stennis Space Center in Mississippi. The rocket’s four engines ignited at 5:27 p.m. EST (2227 GMT) for a test that was to pave the way for the core stage’s shipment to the Kennedy Space Center for launch preparations.





