Related Articles
Hydraulic system issue triggered early engine shutdown during SLS test-firing
NASA officials said Tuesday the weekend test-firing of the Space Launch System moon rocket’s core stage was cut short by an out-of-limits parameter in a hydraulic system for gimbaling, or vectoring, one of its engines. NASA Administrator Jim Bridenstine told Spaceflight Now engineers are “feeling pretty good” about the data gathered during the shortened test-firing, and managers may decide to ship the SLS core stage to the Kennedy Space Center for launch preparations without re-attempting the planned eight-minute hot fire.
Falcon 9 rocket rolled to launch pad with classified payload
Working overnight on Florida’s Space Coast, SpaceX technicians transferred a two-stage Falcon 9 rocket from the company’s commercial hangar a quarter-mile up the ramp to launch pad 39A early Saturday, positioning the kerosene-fueled booster for liftoff Sunday with a classified payload for the U.S. government’s National Reconnaissance Office.