—--:-- --
Next Launch 
Loading… ·
Days
:
Hrs
:
Min
:
Sec

News Archive

Browse every article published on Spaceflight Now, from launch reports and mission previews to spacecraft development coverage. Use the filters to narrow by topic or search by keyword.

Matching Articles

221 articles
  • Russia looks to China as new space exploration partner

    Russia's decision to partner with China on a planned lunar research station, and not join the U.S.-led Artemis moon program, was disappointing after more than two decades of cooperation on the International Space Station, says NASA's top human spaceflight official.

  • Stacking complete for SLS boosters

    The twin 177-foot-tall solid-fueled boosters for the first flight of NASA's Space Launch System have been stacked inside the Vehicle Assembly Building at the Kennedy Space Center to await arrival of the rocket's cryogenic core stage, which is set for a second engine test on a firing stand in Mississippi later this month.

  • Stuck propulsion valve delays second SLS test-firing

    A troublesome liquid oxygen valve on the Space Launch System's first flight-rated core stage will keep NASA from performing a second test-firing of the rocket's four main engines this week.

  • Biden backs Artemis moon program; watchdog says it’ll cost $86 billion

    The Biden administration supports continuing NASA’s Artemis program to return astronauts back to the moon, the White House said last week, without stating whether it will back away from the program’s already-in-doubt schedule for a lunar landing by the end of 2024.

  • SpaceX wins contract to launch first pieces of NASA’s Gateway lunar outpost

    NASA announced Tuesday it has awarded SpaceX a $331 million contract to launch the first two pieces of the Gateway lunar outpost in 2024 using a modified version of the Falcon Heavy rocket to hurl the massive core of the deep space station toward the moon.

  • Hydraulic system issue triggered early engine shutdown during SLS test-firing

    NASA officials said Tuesday the weekend test-firing of the Space Launch System moon rocket's core stage was cut short by an out-of-limits parameter in a hydraulic system for gimbaling, or vectoring, one of its engines. NASA Administrator Jim Bridenstine told Spaceflight Now engineers are "feeling pretty good" about the data gathered during the shortened test-firing, and managers may decide to ship the SLS core stage to the Kennedy Space Center for launch preparations without re-attempting the planned eight-minute hot fire.

  • NASA studying cause of early end to moon rocket test-firing

    A critical test-firing of NASA's Space Launch System moon rocket in Mississippi ended just 67 seconds after it began Saturday, well short of a planned eight-minute burn that was supposed to clear the way for the space agency to finally ship the rocket's core stage to the Kennedy Space Center in Florida for launch preparations.

  • Video: SLS core stage test-firing ends early

    The four RS-25 engines at the bottom of NASA's first Space Launch System core stage shut down about a minute into a ground test-firing Saturday that was supposed to last more than eight minutes.

  • Video

    Live coverage: SLS core stage engines shut down early during critical hotfire test

    A critical test-firing of the Space Launch System's core stage engines cut off about a minute into a planned eight-minute burn Saturday on a test stand at NASA's Stennis Space Center in Mississippi. The rocket's four engines ignited at 5:27 p.m. EST (2227 GMT) for a test that was to pave the way for the core stage's shipment to the Kennedy Space Center for launch preparations.

  • NASA proceeds with SLS booster stacking in Florida before core stage arrives

    NASA ground crews at the Kennedy Space Center are continuing to stack segments of the Space Launch System’s side-mounted solid rocket boosters on a mobile launch platform inside the iconic Vehicle Assembly Building.