—--:-- --
Next Launch 
Loading… ·
Days
:
Hrs
:
Min
:
Sec

News Archive

Browse every article published on Spaceflight Now, from launch reports and mission previews to spacecraft development coverage. Use the filters to narrow by topic or search by keyword.

Matching Articles

534 articles
  • NASA boss pleads for funding to ensure 2024 moon landing

    NASA Administrator Jim Bridenstine told a Senate panel Wednesday that a budget impasse and subsequent spending freeze later this year would be "devastating" to the agency's goal of sending the first woman and next man to the moon by the end of 2024.

  • SpaceX points to leaky valve as culprit in Crew Dragon test accident

    Investigators believe a leak of propellant inside the Crew Dragon spacecraft's propulsion system led to the capsule's explosion April 20 during a ground test at Cape Canaveral, and a senior SpaceX official said Monday that delays are making it "increasingly difficult" to fly astronauts on the commercial spaceship before the end of the year.

  • Final assembly and test milestones on tap for NASA’s first Orion moon ship

    The pressurized crew module and European-built service module for NASA's first Orion spacecraft to travel to the moon will be joined together for the first time in the coming weeks at the Kennedy Space Center, with preparations -- at least for Orion -- on a pace to be ready for launch on an unpiloted test flight next year.

  • NASA shakes up moon program management

    In a major shakeup at NASA Headquarters, agency Administrator Jim Bridenstine said Wednesday that Bill Gerstenmaier, the widely respected director of human spaceflight, has been replaced in the midst of an ambitious push to meet the Trump administration's directive to send astronauts back to the moon within five years.

  • Commercial satellite images historic Apollo launch pads

    Maxar's eagle-eyed WorldView 3 satellite captured high-resolution views Monday of NASA's twin Apollo-era launch pads at the Kennedy Space Center in Florida, both now home to new launch vehicles 50 years after humans took their first steps on the moon.

  • SLS mobile launcher moves to pad 39B for final exams

    A towering mobile platform for the agency's Space Launch System arrived at launch pad 39B Friday at the Kennedy Space Center in Florida for a sequence of water and propellant flow tests, swing arm checkouts and other rehearsals that should conclude with managers declaring the spaceport's ground systems ready to support the first SLS launch campaign by the end of the year.

  • Bigelow announces plans for private astronaut flights to space station

    Bigelow Space Operations says it will charge $52 million per seat to send private astronauts to the International Space Station aboard Crew Dragon ferry ships, and has already paid "substantial sums" to SpaceX for up to four dedicated crew missions to the orbiting research complex.

  • Dragon capsule returns to Earth from space station with 2.1 tons of cargo

    Closing out a 30-day mission, a SpaceX Dragon cargo capsule departed the International Space Station on Monday for a fiery trip back to Earth, culminating in re-entry back into the atmosphere and a parachute-assisted splashdown in the Pacific Ocean southwest of Los Angeles.

  • Video

    Live coverage: Dragon cargo capsule returns to Earth

    A commercial Dragon cargo capsule wrapped up a four-week stay at the International Space Station on Monday with a departure from the complex at 12:01 p.m. EDT (1601 GMT). The spacecraft splashed down in the Pacific Ocean at 5:48 p.m. EDT (2148 GMT) with several tons of research specimens and equipment.

  • NASA says SpaceX readying Crew Dragon capsule for possible piloted test flight by end of year

    In parallel with an on-going failure investigation, SpaceX is readying downstream Crew Dragon spacecraft for flight in hopes that corrective actions can be implemented in time to launch two astronauts to the International Space Station before the end of the year, a senior NASA manager said Tuesday.