—--:-- --
Next Launch 
Loading… ·
Days
:
Hrs
:
Min
:
Sec

News Archive

Browse every article published on Spaceflight Now, from launch reports and mission previews to spacecraft development coverage. Use the filters to narrow by topic or search by keyword.

Matching Articles

460 articles
  • Video

    Live updates: NASA reports minimal damage to Kennedy Space Center

    Watch live views from our cameras at NASA's Kennedy Space Center in Florida as Hurricane Ian moves away from Florida after bringing heavy rain and gusty winds to the Space Coast. NASA moved the Artemis 1 moon rocket back inside the Vehicle Assembly Building on Tuesday, and the agency reported minimal damage from the storm.

  • Video

    Live coverage: NASA’s Artemis 1 rocket rolls back to VAB for hurricane protection

    NASA rolled the Space Launch System moon rocket back to the Vehicle Assembly Building early Tuesday at the Kennedy Space Center, moving the more than 30-story-tall launcher to safety as Hurricane Ian threatens Florida. The decision to roll the rocket back to the VAB will likely delay launch of the Artemis 1 lunar test flight until November.

  • Video

    Live coverage: Artemis 1 moon rocket to return to hangar as hurricane threatens Florida

    NASA has decided to roll the SLS moon rocket back to the Vehicle Assembly Building as Florida continues to be threatened by Hurricane Ian.

  • Video

    Live coverage: NASA fully loads Artemis 1 moon rocket in cryogenic test

    NASA's launch team says they got a hydrogen leak under control in a fueling line near the bottom of the Artemis 1 moon rocket's core stage, allowing engineers to continue with a cryogenic tanking test on pad 39B at Kennedy Space Center on Wednesday. The leak temporarily halted operations to load more than 750,000 gallons of super-cold liquid hydrogen and liquid oxygen into the Space Launch System.

  • Video

    Live coverage: NASA to conduct Artemis 1 repair work at the launch pad

    NASA says it will carry out repairs and tests on the Artemis 1 rocket at the launch pad rather than immediately rolling back to the hangar. The agency needs the Space Force to extend the certification of flight termination batteries if it wants to make another launch attempt in September. Otherwise the rocket will have to return to the assembly building and face a lengthy delay.

  • Video

    Video: Replay of Artemis 1 wet dress rehearsal, now with countdown audio

    More than two months after a practice countdown for the Artemis 1 launch, NASA has released audio from the launch team after gaining export control clearance. The audio provides a sneak peek of what to expect on launch day.

  • Video

    Video: Interview with former NASA astronaut Doug Hurley

    Former NASA astronaut Doug Hurley visited with Spaceflight Now before the launch of the Artemis 1 lunar test flight. Hurley is a veteran of two space shuttle missions and commanded the first piloted test flight of SpaceX's Crew Dragon spacecraft in 2020. He is now a senior director of business development at Northrop Grumman, supplier of the Space Launch System's solid rocket boosters.

  • Video

    Live coverage: NASA targets Saturday for next Artemis 1 launch attempt

    The countdown for liftoff of NASA's first Space Launch System moon rocket, the most powerful launcher ever to fly from U.S. soil, was scrubbed Monday at the Kennedy Space Center in Florida after teams encountered an issue conditioning one of the four main engines. The next opportunity to launch will be Saturday, Sept. 3. The 32-story-tall rocket will boost a human-rated Orion crew capsule on an unpiloted journey around the moon and back to Earth.

  • Video

    Live coverage: NASA begins two-day launch countdown for Artemis 1 mission

    NASA began the two-day launch countdown for the Artemis 1 lunar test flight at 10:23 a.m. EDT (1423 GMT) Saturday. Liftoff of the Space Launch System moon rocket remains set for Monday during a two-hour window opening at 8:33 a.m. EDT (1233 GMT).

  • Video

    Live coverage: NASA’s Artemis 1 moon rocket rolls to launch pad

    NASA's Space Launch System moon rocket emerged from the Vehicle Assembly Building at the Kennedy Space Center around 10 p.m. EDT Tuesday (0200 GMT Wednesday) for an overnight ride to launch pad 39B. The rocket arrived at the seaside launch complex about 10 hours later. The Artemis 1 mission is set for launch Aug. 29 on its inaugural test flight carrying NASA's Orion spacecraft around the moon.