Spaceflight Now Home



The Mission




Mission: Expedition 9
Spacecraft: Soyuz TMA-4
Launch: April 19, 2004
Time: 0318:47 GMT (11:18:47 p.m. EDT on 18th)
Site: Baikonur Cosmodrome, Kazakhstan
Satellite feed: AMC 9, Transponder 9, C-band

Launch events timeline

Flight Day 1 schedule

Flight Day 2 schedule

Flight Day 3 schedule

Expedition 9 science plan

European DELTA mission



The Crew




Russia's Gennady Padalka and NASA's Mike Fincke will live aboard the International Space Station for a half-year as Expedition 9 while Europe's Andre Kuipers will stay for a week before returning to Earth.

Exp. 9 commander Gennady Padalka

Exp. 9 science officer Mike Fincke

Visiting crewmember Andre Kuipers



The Launcher




The venerable Russian Soyuz rocket will deliver the Soyuz TMA-4 capsule into Earth orbit to dock with the International Space Station.

Rocket fact sheet

Soyuz spacecraft info



NewsAlert



Sign up for our NewsAlert service and have the latest news in astronomy and space e-mailed direct to your desktop.

Enter your e-mail address:

Privacy note: your e-mail address will not be used for any other purpose.



Russian Soyuz rocket
NASA PRESS KIT
Posted: April 15, 2004

 
A Russian Soyuz rocket launches from Baikonur. Credit: NASA
 
Throughout history, more than 1,500 launches have been made with Soyuz launchers to orbit satellites for communications, Earth observation, weather, and scientific missions, as well as for human flights.

The basic Soyuz vehicle is considered a three-stage launcher in Russian terms and is composed of:

A lower portion consisting of four boosters (first stage) and a central core (second stage).

An upper portion, consisting of the third stage, payload adapter and payload fairing.

Liquid oxygen and kerosene are used as propellants in all three Soyuz stages.

First Stage Boosters

The first stage's four boosters are assembled laterally around the second stage central core. The boosters are identical and cylindrical-conic in shape with the oxygen tank located in the cone-shaped portion and the kerosene tank in the cylindrical portion.

An NPO Energomash RD 107 engine with four main chambers and two gimbaled vernier thrusters is used in each booster. The vernier thrusters provide three-axis flight control. Ignition of the first stage boosters and the second stage central core occur simultaneously on the ground. When the boosters have completed their powered flight during ascent, they are separated and the core second stage continues to function.

First stage booster separation occurs when the pre-defined velocity is reached, which is about 118 seconds after liftoff.

Second Stage

An NPO Energomash RD 108 engine powers the Soyuz second stage. This engine differs from those of the boosters by the presence of four vernier thrusters, which are necessary for three-axis flight control of the launcher after the first stage boosters have separated.

An equipment bay located atop the second stage operates during the entire flight of the first and second stages.

Third Stage

The third stage is linked to the Soyuz second stage by a latticework structure. When the second stage's powered flight is complete, the third stage engine is ignited. Separation of the two stages occurs by the direct ignition forces of the third stage engine.

A single-turbopump RD 0110 engine from KB KhA powers the Soyuz third stage.

The third stage engine is fired for about 240 seconds, and cutoff occurs when the calculated velocity increment is reached, After cutoff and separation, the third stage performs an avoidance maneuver by opening an outgassing valve in the liquid oxygen tank.

Launcher Telemetry Tracking & Flight Safety Systems

Soyuz launcher tracking and telemetry is provided through systems in the second and third stages. These two stages have their own radar transponders for ground tracking. Individual telemetry transmitters are in each stage. Launcher health status is downlinked to ground stations along the flight path. Telemetry and tracking data are transmitted to the mission control center, where the incoming data flow is recorded. Partial real-time data processing and plotting is performed for flight following and initial performance assessment. All flight data is analyzed and documented within a few hours after launch.

Baikonur Cosmodrome Launch Operations

Soyuz missions use the Baikonur Cosmodrome's proven infrastructure, and launches are performed by trained personnel with extensive operational experience.

Baikonur Cosmodrome is located in the Republic of Kazakhstan in Central Asia between 45 and 46 degrees north latitude and 63 degrees east longitude. Two launch pads are dedicated to Soyuz missions.

Final Launch Preparations

The assembled launch vehicle is moved to the launch pad on a horizontal railcar. Transfer to the launch zone occurs two days before launch, during which the vehicle is erected and a launch rehearsal is performed that includes activation of all electrical and mechanical equipment.

On launch day, the vehicle is loaded with propellant and the final countdown sequence is started at three hours before the liftoff time.

Rendezvous to Docking

A Soyuz spacecraft generally takes two days after launch to reach the space station. The rendezvous and docking are both automated, though once the spacecraft is within 150 meters (492 feet) of the station, the Russian Mission Control Center just outside Moscow monitors the approach and docking. The Soyuz crew has the capability to manually intervene or execute these operations.





MISSION STATUS CENTER