



|
|

Flight Day 3 schedule
NASA PRESS KIT Posted: April 15, 2004
Orbit 28

Post sleep activity
- A/G, R/T and Recorded TLM and Display TV downlink
- Radar and radio transponder tracking
Orbit 29

Free time, report on HM/DM pressures
- Read up of predicted post burn Form 23 and Form 14
- A/G, R/T and Recorded TLM and Display TV downlink
- Radar and radio transponder tracking
Orbit 30

Free time, read up of Form 2 "Globe Correction," lunch
- Uplink of auto rendezvous command timeline
- A/G, R/T and Recorded TLM and Display TV downlink
- Radar and radio transponder tracking
Orbit 31

Don Sokol spacesuits, ingress DM, close DM/HM hatch
- Active and passive vehicle state vector uplinks
- A/G, R/T and Recorded TLM and Display TV downlink
- Radio transponder tracking
Orbit 32

Terminate +Y solar rotation, reactivate MCS and establish LVLH attitude reference (auto maneuver sequence)
Begin auto rendezvous sequence
- Crew monitoring of LVLH reference build and auto rendezvous timeline execution
- A/G, R/T and Recorded TLM and Display TV downlink
- Radio transponder tracking
Orbit 33

Auto Rendezvous sequence continues, flyaround and station keeping
- Crew monitor
- Comm relays via SM through Altair established
- Form 23 and Form 14 updates
- Fly around and station keeping initiated near end of orbit
- A/G (gnd stations and Altair), R/T TLM (gnd stations), Display TV downlink (gnd stations and Altair)
- Radio transponder tracking
Orbit 34

Final Approach and docking
- Capture to "docking sequence complete" 20 minutes, typically
- Monitor docking interface pressure seal
- Transfer to HM, doff Sokol suits
- A/G (gnd stations and Altair), R/T TLM (gnd stations), Display TV downlink (gnd stations and Altair)
- Radio transponder tracking
Orbit 35

Station/Soyuz pressure equalization
- Report all pressures
- Open transfer hatch, ingress station
- A/G, R/T and playback telemetry
- Radio transponder tracking
|
|
|
|


|