News Archive
Browse every article published on Spaceflight Now, from launch reports and mission previews to spacecraft development coverage. Use the filters to narrow by topic or search by keyword.
Matching Articles
348 articles
VideoFor a second time, poor weather scrubs Cargo Dragon mission launch to the space station
SpaceX’s 34th mission as part of the Commercial Resupply Services 2 contract with NASA will deliver 6,500 pounds of science and supplies to the International Space Station. Liftoff of the Falcon 9 rocket from pad 40 at Cape Canaveral Space Force Station is scheduled for Friday, May 15, at 6:05 p.m. EDT (2205 UTC).
VideoArtemis 2 astronauts arrive in Florida ahead of April 1 launch attempt
The crew is expected to land in Florida around 2:30 p.m. EDT (1830 UTC) on Friday. April 1 at 6:24 p.m. EDT (2224 UTC) is the earliest launch opportunity during a six-day window.

NASA outlines ambitious $20 billion plan for moon base
Along with plans for a moon base, senior NASA managers also outlined work to develop nuclear power systems for use on the moon and Mars to keep astronauts, habitats and other equipment warm while providing the electricity needed for research, construction and daily operations.
VideoNASA returns its SLS rocket back to the launch pad ahead of planned April flight of Artemis 2
The rollout of the 322-foot-tall rocket took fewer than 12 hours after first motion, which occurred at about 12:20 a.m. EDT (0420 UTC). NASA hopes to launch the crewed test flight to the Moon no earlier than April 1.
VideoNASA Administrator teases further Artemis program updates in one-on-one interview
The conversation took place amid the flight readiness review for the Artemis 2 mission, which is currently set to launch no earlier than April 1, 2026, pending work being completed in the Vehicle Assembly Building.

NASA ready for another shot at launching Artemis 2 moon mission
At the conclusion of a two-day flight readiness review, "all the teams polled 'go' to launch and fly Artemis 2 around the moon, pending completion of some of the work before we roll out to the launch pad," said Lori Glaze, associate administrator of Exploration Systems Development at NASA Headquarters.

NASA inspector general assesses agency’s management of moon lander risk
NASA's Office of Inspector General said that while NASA is working to "mitigate and prevent hazards" associated with lunar landers being built by SpaceX and Blue Origin, "there are currently gaps in the agency's approach, including in its testing posture and crew survival analyses," including what might happen after a catastrophic but non-fatal event.

SLS rocket hauled back to VAB for repairs
A 6.6-million-pound Apollo-era crawler-transporter rolled up the ramp to pad 38B on Tuesday and was positioned directly under the 3.5-million-pound Space Launch System rocket and its 11.3-million-pound mobile launch platform.

NASA’s Artemis 2 rocket hit by new problem expected to bump moonshot into early April
Engineers ran into problems repressurizing the Artemis 2 moon rocket’s upper stage helium tanks overnight Friday, a problem that will require rolling the huge rocket off the launch pad and back to its processing hangar for troubleshooting. The work will push the already delayed mission from March to at least early April, officials said Saturday.

Moon mission fueling test concludes with no major problems
The practice countdown began Tuesday night, kicking off a carefully choreographed series of steps to ready the world's most powerful operational rocket for what amounted to a simulated launch Thursday at 8:42 p.m. EST. Controllers then carried out additional tests to make sure the team can recycle, hold and restart an actual launch countdown as needed to handle unexpected problems.