—--:-- --
Next Launch 
Loading… ·
Days
:
Hrs
:
Min
:
Sec

News Archive

Browse every article published on Spaceflight Now, from launch reports and mission previews to spacecraft development coverage. Use the filters to narrow by topic or search by keyword.

Matching Articles

2,715 articles
  • NASA preps for SLS fueling test Wednesday

    Engineers are ready to reload NASA's Artemis moon rocket with supercold fuel Wednesday to make sure a repaired liquid hydrogen quick-disconnect fitting is leak free, one of two requirements that must be met before the agency can make a third attempt to launch the huge booster September 27 on the program's maiden moonshot.

  • NASA delays SLS tanking test, next launch opportunity

    NASA said Monday it is now targeting Wednesday, Sept. 21, for a critical fueling test on the Space Launch System moon rocket, which could allow for another attempt to launch the unpiloted Artemis 1 lunar test flight as soon as Sept. 27, assuming engineers find no problems and the Space Force approves an extension for the rocket's range safety system. The updated schedule is a four-day delay for the SLS tanking test and next launch opportunity.

  • NASA officials evaluating late September launch dates for Artemis 1 moon mission

    NASA officials said Thursday they hope to try again to launch the Artemis 1 moon rocket from the Kennedy Space Center as soon as Sept. 23 or 27, but that schedule comes with two big caveats: A repair to a leaky liquid hydrogen fueling line must hold tight during a tanking test next weekend, and the Space Force's Eastern Range has to extend the certification of batteries on the moon rocket's flight safety system.

  • Hydrogen leak delays moonshot by at least several weeks

    NASA's star-crossed Space Launch System moon rocket was grounded for the second time in five days Saturday, this time by a large hydrogen leak in a fuel line quick-disconnect fitting that will delay the $4.1 billion booster's maiden flight by several weeks, likely into October.

  • Video

    Live coverage: NASA to conduct Artemis 1 repair work at the launch pad

    NASA says it will carry out repairs and tests on the Artemis 1 rocket at the launch pad rather than immediately rolling back to the hangar. The agency needs the Space Force to extend the certification of flight termination batteries if it wants to make another launch attempt in September. Otherwise the rocket will have to return to the assembly building and face a lengthy delay.

  • Lunar demo mission to provide ‘stress test’ for NASA’s Artemis moon program

    The first unpiloted mission for NASA's Artemis lunar program aims to prove out the most powerful rocket to ever launch from U.S. soil, and test the function of a human-rated spacecraft traveling more than 40,000 miles beyond the far side of the moon before blazing back through Earth's atmosphere at nearly 25,000 mph.

  • Italian microsatellite promises orbital photo bonanza after Artemis 1 launch

    Italian engineers are expecting a series of spectacular photos from a tiny satellite that will be released to fly in sync with the interim cryogenic propulsion stage that propels the Orion capsule and European Service Module to the moon from Earth orbit.

  • Giant solar sail will propel tiny spacecraft to intercept and study asteroid

    Catching a ride on Artemis 1 is a miniaturized CubeSat called NEA Scout that will use a thin, aluminum-coated solar sail about the size of a tennis court to propel it towards the smallest asteroid ever to be studied by a spacecraft.

  • Russian cosmonauts work on robotic arm outside space station

    Two Russian cosmonauts completed a 7-hour, 47-minute spacewalk outside the International Space Station Friday to continue testing and readying the European Robotic Arm for regular operations, finishing tasks originally planned for a spacewalk last month that was cut short by a spacesuit battery problem.

  • NASA proceeding with Saturday launch attempt for Artemis 1 moon mission

    Confident that out-of-bounds engine temperature readings during Monday's Artemis 1 countdown came from a bad sensor, NASA officials gave the green light Thursday to move forward with another try Saturday afternoon to launch the agency's giant new moon rocket on an unpiloted test flight from the Kennedy Space Center.