Spaceflight Now




Spaceflight Now +



Subscribe to Spaceflight Now Plus for access to our extensive video collections!
How do I sign up?
Video archive

STS-127: The programs

In advance of shuttle Endeavour's STS-127 mission to the station, managers from both programs discuss the flight.

 Play

STS-127: The mission

A detailed step-by-step preview of Endeavour's STS-125 mission to install an external exposure platform on the station's Kibo science facility.

 Play

STS-127: The EVAs

The lead spacewalk officer provides indepth explanations of the EVAs on Endeavour's assembly mission to the station.

 Play

STS-127: The crew

The seven astronauts launching on Endeavour meet the press in the traditional pre-flight news conference.

 Play

Become a subscriber
More video



Shuttle Endeavour launch date remains up in the air
BY WILLIAM HARWOOD
STORY WRITTEN FOR CBS NEWS "SPACE PLACE" & USED WITH PERMISSION
Posted: June 14, 2009


Bookmark and Share


Technicians work on the gaseous hydrogen venting system. Credit: NASA TV
 
NASA managers Sunday deferred making a formal decision on whether to reschedule the delayed shuttle Endeavour for launch Wednesday or whether to press ahead instead with launch of the agency's $583 million Lunar Reconnaissance Orbiter mission aboard an unmanned Atlas 5 rocket.

But with both missions facing tight launch windows, Mission Management Team Chairman LeRoy Cain said the agency's preference was to launch Endeavour on Wednesday, if possible, to maximize the number of launch opportunities for both programs.

"If shuttle goes first on the 17th, then the most opportunities we can give LRO is two, and that would be on the 19th and 20th," Cain said. "If LRO goes first on the 17th, then the most opportunities we could get for the shuttle is one opportunity, and that would be on the 20th."

A final decision on how to proceed must be made Monday to provide enough time for the Air Force Eastern Range, which provides required tracking and telemetry support for all rockets launched from Florida, to set up its systems to support one launch or the other.

But Cain said if no additional problems develop, and if work to repair a leaky hydrogen vent line umbilical plate on Endeavour's external tank goes smoothly, NASA likely will opt to press ahead with an attempt to launch the shuttle at 5:40:50 a.m. Wednesday.

"In plan A, which is shuttle launching on the 17th and LRO has attempts on the 19th and 20th, we have three total launch opportunities between the two missions," Cain said. "In Plan B, LRO on the 17th and shuttle on the 20th, we only have two total launch opportunities between the two missions. So from an agency standpoint, we're trying to maximize our opportunities.

"We're going to see how the processing goes. If we have some good fortune, if we have some good weather, or at least not too much bad weather, in the next 24, 36 hours, then we think it's achievable for us to get to a (shuttle launch) on the 17th."

Engineers at launch pad 39A at the Kennedy Space Center worked Sunday to replace a seal inside the vent line umbilical plate that leaked during fueling Saturday, delaying Endeavour's launch on a space station assembly mission.

At the nearby Cape Canaveral Air Force Station, Lockheed Martin engineers pressed ahead with work to ready the Lunar Reconnaissance Orbiter for launch from complex 41 on a mission to map the moon in unprecedented detail. The LRO launch window opens Wednesday at 3:51 p.m. and closes at 4:11 p.m.

The forecast for Wednesday calls for a 70 percent chance of good weather for the shuttle's pre-dawn launch window and a 60 percent chance of acceptable conditions for the lunar orbiter's window Wednesday afternoon.

"The final decision on which mission we're going to launch on the 17th is in front of us," Cain said. "We didn't make it today because we don't have to, because the Range reconfiguration requirement deadline is not until sometime tomorrow. And so we're both proceeding in parallel paths toward the 17th. If nothing changes, it looks like the preference would be to maximize the opportunities, shuttle first. Again, a decision will be made tomorrow."

If LRO is not off the ground by June 20, the flight will slip to the end of the month. If Endeavour is not off the ground by June 20 or 21 at the latest, the shuttle launch will be delayed to July 11 because of temperature constraints related to the space station's orbit.

If the shuttle does indeed get the nod for a Wednesday launch try, Endeavour's interrupted countdown would resume at the T-minus 11-hour mark at 1:15 p.m. Tuesday.


Technicians work in the ground umbilical carrier plate assembly attached to the backside of the shuttle's external tank. Credit: NASA TV
 
Endeavour was grounded during fueling overnight Friday when the gaseous hydrogen vent line umbilical plate on the side of the shuttle's external fuel tank began leaking potentially dangerous vapors as the hydrogen section of the tank was filled.

Some of the supercold liquid hydrogen propellant inside the tank constantly turns into a gas that is routed overboard through a vent line to a flare stack near the pad where it is harmlessly burned away. The vent line attaches to the tank at an umbilical plate that pulls away at liftoff.

During an attempt to launch the shuttle Discovery last March, a gaseous hydrogen leak in the umbilical plate triggered a four-day delay. Engineers were unable to duplicate the leak under ambient conditions - it only occurred when cryogenic hydrogen was filling the tank - but after replacing a critical internal seal, the umbilical worked normally and Discovery was able to take off.

A virtually identical scenario is playing out with Endeavour. Engineers were unable to duplicate the leak after the tank was drained and mission managers decided to press ahead with a seal replacement.

Launch Director Pete Nickolenko said engineers discovered small areas where the seal in question appeared to have pulled away from the external tank slightly, possibly due to exposure to cryogenic conditions. The gaps seen are similar to those found during troubleshooting of the leak that grounded Discovery in March.

Engineers are trying to figure out what caused seal problems in two of the last three shuttle flights, but in the meantime, "we are on the path of installing a new quick-disconnect and a new flight seal," Nickolenko said.

The work is expected to be finished early Tuesday.

"In summary, the team is processing on the path towards a launch attempt on the 17th," Nickolenko said. "The team is optimistic that our quick-disconnects and seal removal and replacement will fix the problem. THe schedule that we're moving toward is very tight, but it is achievable. All other turnaround activities are proceeding nominally."

Spaceflight Now Plus
Additional coverage for subscribers:
VIDEO: LEAK POSTPONES SHUTTLE ENDEAVOUR LAUNCH PLAY

VIDEO: TIME-LAPSE OF SUN SETTING OVER PAD 39A PLAY
VIDEO: ANOTHER TIME-LAPSE OF GANTRY RETRACTION PLAY
VIDEO: TIME-LAPSE OF LAUNCH PAD TOWER ROLLBACK PLAY

VIDEO: PRE-LAUNCH INTERVIEW WITH MARK POLANSKY PLAY
VIDEO: PRE-LAUNCH INTERVIEW WITH DOUG HURLEY PLAY
VIDEO: PRE-LAUNCH INTERVIEW WITH CHRIS CASSIDY PLAY
VIDEO: PRE-LAUNCH INTERVIEW WITH JULIE PAYETTE PLAY
VIDEO: PRE-LAUNCH INTERVIEW WITH TOM MARSHBURN PLAY
VIDEO: PRE-LAUNCH INTERVIEW WITH DAVE WOLF PLAY

VIDEO: THE STS-127 MISSION PREVIEW MOVIE PLAY
VIDEO: THURSDAY'S PRE-LAUNCH NEWS CONFERENCE PLAY
VIDEO: JAPANESE SCIENCE FACILITIES ABOARD STATION PLAY
VIDEO: COUNTDOWN BEGINS TICKING FOR SATURDAY'S LAUNCH PLAY
VIDEO: LAUNCH COUNTDOWN PREVIEW BRIEFING PLAY
VIDEO: CREW ARRIVES JUST BEFORE MIDNIGHT PLAY | HI-DEF
VIDEO: GET TO KNOW ENDEAVOUR'S ASTRONAUTS PLAY

VIDEO: ASTRONAUTS PRACTICE EVACUATION OF SHUTTLE PLAY | HI-DEF
VIDEO: CREW BOARDS SHUTTLE FOR PRACTICE COUNT PLAY | HI-DEF
VIDEO: ASTRONAUTS SUIT UP FOR DRESS REHEARSAL PLAY | HI-DEF
VIDEO: CREW INSPECTS CARGO IN THE PAYLOAD BAY PLAY | HI-DEF
VIDEO: TRAINING SESSIONS AT LAUNCH PAD AND BUNKER PLAY | HI-DEF
VIDEO: INFORMAL CREW NEWS CONFERENCE AT LAUNCH PAD PLAY
VIDEO: ASTRONAUTS ARRIVE FOR PRACTICE COUNTDOWN PLAY

VIDEO: FLIGHT READINESS REVIEW SETS LAUNCH DATE PLAY

VIDEO: PAD 39A GANTRY ENCLOSES SHUTTLE PLAY | HI-DEF
VIDEO: ROLLAROUND MOVES ENDEAVOUR TO PAD 39A PLAY | HI-DEF
VIDEO: ENDEAVOUR IS HAULED OFF LAUNCH PAD 39B PLAY | HI-DEF
VIDEO: TIME-LAPSE OF SHUTTLE'S LAUNCH PAD SWITCH PLAY

VIDEO: SHUTTLE AND STATION PROGRAM UPDATE PLAY
VIDEO: THE STS-127 MISSION OVERVIEW BRIEFING PLAY
VIDEO: PREVIEW BRIEFING ON MISSION'S SPACEWALKS PLAY
VIDEO: THE ASTRONAUTS' PRE-FLIGHT NEWS BRIEFING PLAY

VIDEO: PAD 39B AND ITS LAST SPACE SHUTTLE PLAY | HI-DEF
VIDEO: ENDEAVOUR'S SUNRISE ARRIVAL AT PAD 39B PLAY | HI-DEF
VIDEO: MIDNIGHT ROLLOUT FROM ASSEMBLY BUILDING PLAY | HI-DEF
VIDEO: ENDEAVOUR HOISTED FOR ATTACHMENT TO TANK PLAY | HI-DEF
VIDEO: CRANE ROTATES ENDEAVOUR VERTICALLY PLAY | HI-DEF
VIDEO: ENDEAVOUR MOVES TO ASSEMBLY BUILDING PLAY | HI-DEF
VIDEO: ORION AND ARES ROCKET PROGRESS REPORT PLAY
SUBSCRIBE NOW