Spaceflight Now Home



Spaceflight Now +



Premium video content for our Spaceflight Now Plus subscribers.

Apollo 11 returns
Apollo 11 safely returns to Earth, making a parachute-assisted splashdown in the ocean. (3min 57sec file)
 Play video

MESSENGER preview
Mission officials and scientists preview the flight of NASA's MESSENGER space probe to orbit the planet Mercury during this news conference. (41min 36sec file)
 Play video

Apollo 11 moonwalk
Armstrong and Aldrin gather lunar samples and conduct experiments during their moonwalk. (2min 27sec file)
 Play video

Moon landing explained
The Apollo 11 astronauts narrate footage of their historic landing on the moon and describe the technical details of the descent. (22min 02sec file)
 Play video

Leaving the moon
The Eagle lunar module returns to the orbiting command module and the Apollo 11 astronauts head back to Earth. (5min 33sec file)
 Play video

Anniversary celebration
The Apollo 11 astronauts and other dignitaries hold a special 35th anniversary celebration in Washington on July 20. Hear from Armstrong, Aldrin, Collins, Walter Cronkite, NASA Administrator O'Keefe and others. (76min 12sec file)
 Play video

Become a subscriber
More video



NewsAlert



Sign up for our NewsAlert service and have the latest news in astronomy and space e-mailed direct to your desktop.

Enter your e-mail address:

Privacy note: your e-mail address will not be used for any other purpose.



NASA approves new design for shuttle tank bipod
NASA NEWS RELEASE
Posted: July 26, 2004

NASA is moving ahead with plans to redesign a part of the Space Shuttle external fuel tank that investigators believe played a critical role in the Space Shuttle Columbia accident. The Space Shuttle program will soon begin manufacturing and installing an improved bipod fitting, which connects the external fuel tank to the Shuttle during launch.

A Critical Design Review Board of NASA managers, engineers and aerospace contractors last month approved the new design, a significant milestone in the effort to return the Shuttle to safe flight. The approval allows workers to begin incorporating the new fitting on External Tank No. 120, the tank slated for flight on the next Shuttle mission, designated STS-114.

Investigators believe that during Columbia's launch in January 2003, insulating foam from the bipod area fell off the external tank and damaged the left wing of the Space Shuttle. The new design addresses the Columbia Accident Investigation Board recommendation to reduce the risk to the Shuttle from falling debris during liftoff. It eliminates the foam covering from the bipod fitting and replaces it with four rod-shaped heaters. The heaters will serve the same primary function as the foam, preventing ice buildup on the tank's bipod fittings.

"This is a fix that really gets to the root of the technical problems that caused the loss of Columbia," said Michael Kostelnik, NASA's Deputy Associate Administrator for International Space Station and Space Shuttle Programs. "By eliminating this debris source, as well as potential debris from other areas, we are making the Shuttle a safer spacecraft."

The External Tank Project Office at NASA's Marshall Space Flight Center, Huntsville, Ala., first began developing redesign concepts for the bipod fitting after insulating foam from the left bipod ramp area detached during the October 2002 launch of Space Shuttle Atlantis.

The newly designed heaters will be placed below the fitting, in covers made of a strong alloy composed of nickel, chromium and iron. They will sit on top of a copper plate sandwiched between the fitting and a hard, dense material that separates the heater from the tank.

The design will be retrofitted on the 11 existing tanks and incorporated into the manufacture of all new tanks. Lockheed Martin Space Systems will do the work at NASA's Michoud Assembly Facility in New Orleans. Delivery of the retrofitted tanks to NASA's Kennedy Space Center, Florida, is expected in October.