STS-135 Countdown Timeline COMPILED BY WILLIAM HARWOOD Updated: June 15, 2011
Editor's Note: The launch window is roughly 10 minutes long. To maximize ascent performance, NASA targets the middle of the window. A final hold in the countdown at the T-minus nine-minute mark will be extended as required to hit the desired launch time.
HH...MM...SS...EDT...........EVENT Tue 07/05/11 ...............12:30 PM......Call to stations 70...21...00...01:00 PM......Countdown begins 60...21...00...11:00 PM......Fuel cell reactant load preps Wed 07/06/11 54...51...00...04:30 AM......MEC/SRB power up 54...21...00...05:00 AM......Clear crew module 54...21...00...05:00 AM......Begin 4-hour built-in hold 54...21...00...05:00 AM......Clear blast danger area 53...36...00...05:45 AM......Orbiter pyro-initiator controller test 53...26...00...05:55 AM......SRB PIC test 52...26...00...06:55 AM......Master events controller pre-flight BITE test 50...21...00...09:00 AM......Resume countdown 48...51...00...10:30 AM......Fuel cell oxygen loading begins 46...21...00...01:00 PM......Fuel cell oxygen load complete 46...21...00...01:00 PM......Fuel cell hydrogen loading begins 43...51...00...03:30 PM......Fuel cell hydrogen loading complete 42...51...00...04:30 PM......Pad open; ingress white room 42...21...00...05:00 PM......Begin 4-hour built-in hold 41...51...00...05:30 PM......OMBUU demate 41...21...00...06:00 PM......Crew module clean and vacuum 39...21...00...08:00 PM......Remove APU vent covers 38...51...00...08:30 PM......MPS 2000 PSI test 38...21...00...09:00 PM......Countdown resumes 38...21...00...09:00 PM......Main engine preps 38...21...00...09:00 PM......MECs 1 and 2 on; avionics system checkout Thu 07/07/11 35...21...00...12:00 AM......LO2/LH2 feedline inspection 31...51...00...03:30 AM......Deflate RSS dock seals; tile inspection 31...21...00...04:00 AM......Tile inspection 30...56...00...04:25 AM......TSM prepped for fueling 30...21...00...05:00 AM......Begin 14-hour 6-minute hold 27...51...00...07:30 AM......RSS rotation preps 27...51...00...07:30 AM......OIS communications check with JSC 27...36...00...07:45 AM......Crew weather briefing 27...01...00...08:20 AM......JSC flight control team on station 26...21...00...09:00 AM......L-1 engineering briefing 25...51...00...09:30 AM......Comm activation 25...21...00...10:00 AM......Crew module voice checks 24...21...00...11:00 AM......Flight crew equipment late stow 21...21...00...02:00 PM......RSS to park position 21...21...00...02:00 PM......Ascent switch list 20...21...00...03:00 PM......Final TPS, debris inspection 16...20...00...07:01 PM......Resume countdown 16...00...00...07:21 PM......Pad clear of non-essential personnel 16...00...00...07:21 PM......APU bite test 15...10...00...08:11 PM......Fuel cell activation 14...20...00...09:01 PM......Booster joint heater activation 13...50...00...09:31 PM......MEC pre-flight bite test 13...35...00...09:46 PM......Tanking weather update 12...50...00...10:31 PM......Final fueling preps; launch area clear 12...20...00...11:01 PM......Red crew assembled 11...35...00...11:46 PM......Fuel cell integrity checks complete Fri 07/08/11 11...20...00...12:01 AM......Begin 2-hour built-in hold (T-minus 6 hours) 11...10...00...12:11 AM......Safe-and-arm PIC test 10...32...00...12:49 AM......Crew wakeup 10...20...00...01:01 AM......External tank ready for loading 10...02...00...01:19 AM......Mission management team tanking meeting 09...26...00...01:55 AM......NASA TV fueling coverage begins 09...20...00...02:01 AM......Resume countdown (T-minus 6 hours) 09...20...00...02:01 AM......LO2, LH2 transfer line chilldown 09...10...00...02:11 AM......Main propulsion system chill down 09...10...00...02:11 AM......LH2 slow fill 08...40...00...02:41 AM......LO2 slow fill 08...35...00...02:46 AM......Hydrogen ECO sensors go wet 08...30...00...02:51 AM......LO2 fast fill 08...20...00...03:01 AM......LH2 fast fill 06...25...00...04:56 AM......LH2 topping 06...20...00...05:01 AM......LH2 replenish 06...20...00...05:01 AM......LO2 replenish 06...20...00...05:01 AM......Begin 2-hour 30-minute built-in hold (T-minus 3 hours) 06...20...00...05:01 AM......Closeout crew to white room 06...20...00...05:01 AM......External tank in stable replenish mode 06...17...00...05:04 AM......Ascent flight control team on console 06...05...00...05:16 AM......Astronaut support personnel comm checks 05...35...00...05:46 AM......Pre-ingress switch reconfig 05...26...00...05:55 AM......NASA TV launch coverage begins 04...25...00...06:56 AM......Final crew weather briefing 04...15...00...07:06 AM......Crew suit up begins 03...50...00...07:31 AM......Resume countdown (T-minus 3 hours) 03...45...00...07:36 AM......Crew departs O&C building 03...15...00...08:06 AM......Crew ingress 02...25...00...08:56 AM......Astronaut comm checks 02...00...00...09:21 AM......Hatch closure 01...30...00...09:51 AM......White room closeout 01...10...00...10:11 AM......Begin 10-minute built-in hold (T-minus 20m) 01...00...00...10:21 AM......NASA test director countdown briefing 01...00...00...10:21 AM......Resume countdown (T-minus 20m) 00...59...00...10:22 AM......Backup flight computer to OPS 1 00...55...00...10:26 AM......KSC area clear to launch 00...49...00...10:32 AM......Begin final built-in hold (T-minus 9m) 00...24...00...10:57 AM......NTD launch status verification 00...09...00...11:17:46 AM...Resume countdown (T-minus 9m) 00...07...30...11:19:16 AM...Orbiter access arm retraction 00...05...00...11:21:46 AM...Launch window opens 00...05...00...11:21:46 AM...Hydraulic power system (APU) start 00...04...55...11:21:51 AM...Terminate LO2 replenish 00...04...00...11:22:46 AM...Purge sequence 4 hydraulic test 00...04...00...11:22:46 AM...IMUs to inertial 00...03...55...11:22:51 AM...Aerosurface profile 00...03...30...11:23:16 AM...Main engine steering test 00...02...55...11:23:51 AM...LO2 tank pressurization 00...02...35...11:24:11 AM...Fuel cells to internal reactants 00...02...30...11:24:16 AM...Clear caution-and-warning memory 00...02...00...11:24:46 AM...Crew closes visors 00...01...57...11:24:49 AM...LH2 tank pressurization 00...00...50...11:25:56 AM...SRB joint heater deactivation 00...00...31...11:26:15 AM...Shuttle GPCs take control of countdown 00...00...21...11:26:25 AM...SRB steering test 00...00...07...11:26:39 AM...Main engine start (T-6.6 seconds) 00...00...00...11:26:46 AM...SRB ignition (LAUNCH) |
||||||||||||||||||||||||||||||||||||||||
|
INDEX | PLUS | NEWS ARCHIVE | LAUNCH SCHEDULE ASTRONOMY NOW | STORE ADVERTISE © 2012 Spaceflight Now Inc. |
||||||||||||||||||||||||||||||||||||||||||