STS-134 Countdown Timeline COMPILED BY WILLIAM HARWOOD Updated: May 15, 2011
Editor's Note: The launch window is roughly 10 minutes long. To maximize ascent performance, NASA targets the middle of the window. A final hold in the countdown at the T-minus nine-minute mark will be extended as required to hit the desired launch time.
HH...MM...SS...EDT...........EVENT Fri 05/13/11 ...............06:30 AM......Call to stations 73...56...00...07:00 AM......Countdown begins 63...56...00...05:00 PM......Fuel cell reactant load preps 58...26...00...10:30 PM......MEC/SRB power up 57...56...00...11:00 PM......Clear crew module 57...56...00...11:00 PM......Begin 4-hour built-in hold 57...56...00...11:00 PM......Clear blast danger area 57...11...00...11:45 PM......Orbiter pyro-initiator controller test Sat 05/14/11 56...56...00...12:00 AM......SRB PIC test 56...11...00...12:45 AM......Master events controller pre-flight BITE test 53...56...00...03:00 AM......Resume countdown 52...26...00...04:30 AM......Fuel cell oxygen loading begins 49...56...00...07:00 AM......Fuel cell oxygen load complete 49...56...00...07:00 AM......Fuel cell hydrogen loading begins 47...26...00...09:30 AM......Fuel cell hydrogen loading complete 46...26...00...10:30 AM......Pad open; ingress white room 45...56...00...11:00 AM......Begin 8-hour built-in hold 45...56...00...11:00 AM......PRSD offload 44...56...00...12:00 PM......Crew module clean and vacuum 41...56...00...03:00 PM......Remove APU vent covers 40...56...00...04:00 PM......SSME throat plug removal 39...26...00...05:30 PM......OMBUU demate 37...26...00...07:30 PM......Countdown resumes 37...56...00...07:00 PM......Main engine preps 37...56...00...07:00 PM......MECs 1 and 2 on; avionics system checkout 34...56...00...10:00 PM......FRCS Tyvek cover remova/inspect Sun 05/15/11 31...26...00...01:30 AM......Deflate RSS dock seals; tile inspection 30...56...00...02:00 AM......Tile inspection 30...56...00...02:00 AM......TSM prepped for fueling 29...56...00...03:00 AM......Begin 13-hour 36-minute hold 28...26...00...04:30 AM......RSS rotation preps 28...26...00...04:30 AM......OIS communications check with JSC 28...11...00...04:45 AM......Crew weather briefing 27...36...00...05:20 AM......JSC flight control team on station 26...56...00...06:00 AM......L-1 engineering briefing 26...26...00...06:30 AM......Comm activation 25...56...00...07:00 AM......Crew module voice checks 24...56...00...08:00 AM......Flight crew equipment late stow 20...56...00...12:00 PM......RSS to park position 19...56...00...01:00 PM......Final TPS, debris inspection 19...26...00...01:30 PM......Ascent switch list 16...20...00...04:36 PM......Resume countdown 16...00...00...04:56 PM......Pad clear of non-essential personnel 16...00...00...04:56 PM......APU bite test 15...10...00...05:46 PM......Fuel cell activation 14...20...00...06:36 PM......Booster joint heater activation 13...50...00...07:06 PM......MEC pre-flight bite test 13...35...00...07:21 PM......Tanking weather update 12...50...00...08:06 PM......Final fueling preps; launch area clear 12...20...00...08:36 PM......Red crew assembled 11...35...00...09:21 PM......Fuel cell integrity checks complete 11...20...00...09:36 PM......Begin 2-hour built-in hold (T-minus 6 hours) 11...10...00...09:46 PM......Safe-and-arm PIC test 10...32...00...10:24 PM......Crew wakeup 10...20...00...10:36 PM......External tank ready for loading 10...02...00...10:54 PM......Mission management team tanking meeting 09...46...00...11:10 PM......NASA TV fueling coverage begins 09...20...00...11:36 PM......Resume countdown (T-minus 6 hours) 09...20...00...11:36 PM......LO2, LH2 transfer line chilldown 09...10...00...11:46 PM......Main propulsion system chill down 09...10...00...11:46 PM......LH2 slow fill Mon 05/16/11 08...40...00...12:16 AM......LO2 slow fill 08...35...00...12:21 AM......Hydrogen ECO sensors go wet 08...30...00...12:26 AM......LO2 fast fill 08...20...00...12:36 AM......LH2 fast fill 06...25...00...02:31 AM......LH2 topping 06...20...00...02:36 AM......LH2 replenish 06...20...00...02:36 AM......LO2 replenish 06...20...00...02:36 AM......Begin 2-hour 30-minute built-in hold (T-minus 3 hours) 06...20...00...02:36 AM......Closeout crew to white room 06...20...00...02:36 AM......External tank in stable replenish mode 06...17...00...02:39 AM......Ascent flight control team on console 06...05...00...02:51 AM......Astronaut support personnel comm checks 05...35...00...03:21 AM......Pre-ingress switch reconfig 05...16...00...03:40 AM......NASA TV launch coverage begins 04...25...00...04:31 AM......Final crew weather briefing 04...15...00...04:41 AM......Crew suit up begins 03...50...00...05:06 AM......Resume countdown (T-minus 3 hours) 03...45...00...05:11 AM......Crew departs O&C building 03...15...00...05:41 AM......Crew ingress 02...25...00...06:31 AM......Astronaut comm checks 02...00...00...06:56 AM......Hatch closure 01...30...00...07:26 AM......White room closeout 01...10...00...07:46 AM......Begin 10-minute built-in hold (T-minus 20m) 01...00...00...07:56 AM......NASA test director countdown briefing 01...00...00...07:56 AM......Resume countdown (T-minus 20m) 00...59...00...07:57 AM......Backup flight computer to OPS 1 00...55...00...08:01 AM......KSC area clear to launch 00...49...00...08:07 AM......Begin final built-in hold (T-minus 9m) 00...24...00...08:32 AM......NTD launch status verification 00...09...00...08:47:28 AM...Resume countdown (T-minus 9m) 00...07...30...08:48:58 AM...Orbiter access arm retraction 00...05...00...08:56:28 AM...Launch window opens (placeholder; not needed for STS-134) 00...05...00...08:51:28 AM...Hydraulic power system (APU) start 00...04...55...08:51:33 AM...Terminate LO2 replenish 00...04...00...08:52:28 AM...Purge sequence 4 hydraulic test 00...04...00...08:52:28 AM...IMUs to inertial 00...03...55...08:52:33 AM...Aerosurface profile 00...03...30...08:52:58 AM...Main engine steering test 00...02...55...08:53:33 AM...LO2 tank pressurization 00...02...35...08:53:53 AM...Fuel cells to internal reactants 00...02...30...08:53:58 AM...Clear caution-and-warning memory 00...02...00...08:54:28 AM...Crew closes visors 00...01...57...08:54:31 AM...LH2 tank pressurization 00...00...50...08:55:38 AM...SRB joint heater deactivation 00...00...31...08:55:57 AM...Shuttle GPCs take control of countdown 00...00...21...08:56:07 AM...SRB steering test 00...00...07...08:56:21 AM...Main engine start (T-6.6 seconds) 00...00...00...08:56:28 AM...SRB ignition (LAUNCH) |
||||||||||||||||||||||||||||||||||||||||
|
INDEX | PLUS | NEWS ARCHIVE | LAUNCH SCHEDULE ASTRONOMY NOW | STORE ADVERTISE © 2012 Spaceflight Now Inc. |
||||||||||||||||||||||||||||||||||||||||||