Spaceflight Now Home



Spaceflight Now +



Subscribe to Spaceflight Now Plus for access to our extensive video collections!
How do I sign up?
Video archive

Meet the Hubble crew

Meet the crew launching on Atlantis' STS-125 mission to service the Hubble Space Telescope and learn how each became an astronaut in this special biography movie.

 Play

Phoenix update

Scientists report on the progress of the Phoenix lander exploring the northern plains of Mars during this July 31 update.

 Briefing | Panorama

Expedition 18 crew

The American, Russian and Japanese crewmembers to serve aboard the space station during various stages of the Expedition 18 mission, plus spaceflight participant Richard Garriott hold this pre-flight news conference.

 Play

STS-94: Rapid re-flight

Three months after their 1997 flight was cut short by a fuel cell problem, the same seven astronauts returned to space aboard shuttle Columbia to fulfill the Spacelab science mission. The STS-94 crew tells the story in this post-flight presentation.

 Play

STS-124: In review

The STS-124 crew narrates highlights from its mission that delivered Japan's Kibo lab module to the station.

 Full presentation
 Mission film

Jason 2 launch

A ULA Delta 2 rocket launched the Jason 2 oceanography satellite from Vandenberg Air Force Base on June 20.

 Full Coverage

STS-124 space shuttle mission coverage

Extensive video collection covering shuttle Discovery's mission to deliver the Japanese Kibo science lab to the station is available in the archives.

 Full Coverage

Phoenix lands on Mars

The Phoenix spacecraft arrived at Mars on May 25, safely landing on the northern plains to examine the soil and water ice.

 Full Coverage

Become a subscriber
More video



NewsAlert



Sign up for our NewsAlert service and have the latest news in astronomy and space e-mailed direct to your desktop.

Enter your e-mail address:

Privacy note: your e-mail address will not be used for any other purpose.



NASA engineers complete test series for Ares I rocket
NASA NEWS RELEASE
Posted: August 18, 2008

HUNTSVILLE, Ala. -- Engineers at NASA's Marshall Space Flight Center in Huntsville, Ala., have completed a series of tests on a key component of the J-2X engine. The J-2X powers the upper stage of the Ares I rocket, which will launch human explorers to the International Space Station and to the moon.

The test on Aug. 15 was the last of 20 in this series, concluding the second of four planned sets of tests on the J-2X's workhorse gas generator, the driver for the turbopumps which start the engine.

The gas generator test program is designed to demonstrate the component's performance, durability and combustion environment, and to reduce risk in the design, fabrication and operation of flight hardware. The third phase of testing will begin in July 2009. The J-2X's workhorse gas generator is fabricated by Pratt and Whitney Rocketdyne of Canoga Park, Calif.

The primary objectives achieved in this series of tests were to regulate ignition timing and address stability issues in the gas chamber. During engine start, a pressurized helium system begins to turn the turbopumps, which draw liquid hydrogen and liquid oxygen propellants into the system. The propellants flow into the generator's combustion chamber, where they are sparked into life by pyrotechnic igniters installed in the side of the main combustion chamber.

Once combustion is initiated, hot gases flow into the turbine. The combustion gas provided by the generator drives the turbomachinery, which delivers high pressure propellants to the main injector during the J-2X burn. This testing allows engineers to address stability issues that can arise during operation of the combustion chamber and will allow engineers to develop a clean design for the J-2X engine.

Beginning in 2015, the Ares I rocket will carry the Orion crew capsule and as many as six astronauts and small payloads to the International Space Station. During the first two-and-a-half minutes of flight, the first stage booster will power the vehicle to an altitude of about 189,000 feet, or 36 miles, at a speed of Mach 4.8. After its propellant is spent, the reusable booster will separate, and the upper stage's J-2X engine will ignite -- powering the Orion to low Earth orbit at an altitude of about 425,328 feet, or roughly 80 miles.

The workhorse gas generator test series is an essential step in development of the J-2X engine. More than 50 tests have been performed on the generator to date. This generator was manufactured to be more durable than the generators that will be used in the J-2X engine, allowing it to withstand numerous tests.

NASA's Johnson Space Center in Houston manages NASA's Constellation Program, which includes development of the Ares I rocket, the Ares V heavy launch vehicle for cargo launcher, the Orion crew capsule, and the Altair lunar lander. Marshall manages Ares projects for the agency.