Spaceflight Now Home



Spaceflight Now +



Subscribe to Spaceflight Now Plus for access to our extensive video collections!
How do I sign up?
Video archive

Launching on the shuttle

Video cameras on the boosters and tank, plus a cockpit camera show what the shuttle and its astronauts experience during the trek to space.

 Full coverage

STS-120: In review

The STS-120 crew narrates highlights from its mission that delivered the station's Harmony module and moved the P6 power truss.

 Full presentation
 Mission film

STS-123: TCDT

The STS-123 astronauts complete their countdown dress rehearsal at Kennedy Space Center.

 Full coverage

STS-123: To the pad

Endeavour travels to pad 39A in the overnight hours of Feb. 18 in preparation for liftoff on STS-123.

 Play | X-Large

NASA '09 budget

NASA officials present President Bush's proposed Fiscal Year 2009 budget for the agency.

 Play

Introduction to ATV

Preview the maiden voyage of European's first Automated Transfer Vehicle, named Jules Verne. The craft will deliver cargo to the International Space Station.

 Full coverage

Become a subscriber
More video



GLAST arrives in Florida to prepare for launch
NASA NEWS RELEASE
Posted: March 4, 2008

CAPE CANAVERAL, Fla. - NASA's Gamma-ray Large Area Space Telescope, or GLAST, arrived Tuesday at the Astrotech payload processing facility near the Kennedy Space Center to begin final preparations for launch. Liftoff of GLAST aboard a Delta II rocket is currently targeted for 11:45 a.m. EDT on May 16.

GLAST is a collaborative mission with the U.S. Department of Energy, international partners from France, Germany, Italy, Japan and Sweden, and numerous academic institutions from the U.S. and abroad. The spacecraft will explore the most extreme environments in the universe, and answer questions about supermassive black hole systems, pulsars and the origin of cosmic rays. It also will study the mystery of powerful explosions known as gamma-ray bursts.

The milestones to be accomplished over the next two months include attaching the Ku-band communications antenna and the two sets of solar arrays, a complete checkout of GLAST's scientific instruments, installing the spacecraft's battery, and loading aboard the observatory's propellant. These activities will be performed by General Dynamics, builder of the spacecraft for NASA. GLAST currently is scheduled to be transported to Pad 17-B at Cape Canaveral Air Force Station on May 1.

The rocket that will launch GLAST is a Delta II 7920-H, manufactured and prepared for launch by United Launch Alliance. It is a heavier-lift model of the standard Delta II that uses larger solid rocket boosters. The first stage is scheduled to be erected on Pad 17-B the week of March 17.

The following week, the nine strap-on solid rocket boosters will be raised and attached. The second stage, which burns hypergolic propellants, will be hoisted atop the first stage in late March. Next, the fairing that will surround the spacecraft will be hoisted into the clean room of the mobile service tower.

Engineers will perform several tests of the Delta II. In late April, the first stage will be loaded with liquid oxygen and checked for leaks. The following day, a simulated flight test will be performed, testing the vehicle's post-liftoff flight events without fuel aboard. The electrical and mechanical systems of the entire Delta II will be exercised during this test.

Once the GLAST payload is atop the launch vehicle, a final major test will be performed. The combined minus count and plus count test simulates all events as they will occur on launch day, but without propellants aboard the vehicle.

The NASA Launch Services Program at Kennedy Space Center is responsible for the countdown and launch management of the Delta II GLAST mission.