Spaceflight Now Home



Spaceflight Now +



Subscribe to Spaceflight Now Plus for access to our extensive video collections!
How do I sign up?
Video archive

Mars lander preview

A preview of NASA's Phoenix Mars lander mission and the science objectives to dig into the arctic plains of the Red Planet are presented here.

 Play

Phoenix animation

Project officials narrate animation of Phoenix's launch from Earth, arrival at Mars, touchdown using landing rockets and the craft's robot arm and science gear in action.

 Play

Dawn launch delay

Jim Green, director of the Planetary Science Division at NASA Headquarters, explains why the agency decided to delay launch of the Dawn asteroid probe from July to September.

 Play

Endeavour rolls to VAB

Shuttle Endeavour is transported from its hangar to the Vehicle Assembly Building for joining with a fuel tank and boosters for launch on STS-118.

 Play

Welcome home, Atlantis

The Shuttle Carrier Aircraft touches down on Kennedy Space Center's Runway 15 on July 3, delivering Atlantis back to its homeport after a two-day coast-to-coast ferry flight.

 Landing | Tow

Atlantis heads home

Nine days after landing at Edwards Air Force Base to conclude the STS-117 mission, Atlantis begins its cross-country ferry flight back to Florida.

 Taxi | Takeoff

Dawn preview movie

Learn more about the upcoming Dawn mission that will use an ion engine propulsion system to visit two of the largest objects in the asteroid belt.

 Play

Become a subscriber
More video



Upper stage engine contract awarded for Ares rockets
NASA NEWS RELEASE
Posted: July 16, 2007

WASHINGTON - NASA has signed a $1.2 billion contract with Pratt and Whitney Rocketdyne Inc., of Canoga Park, Calif., for design, development, testing and evaluation of the J-2X engine that will power the upper stages of the Ares I and Ares V launch vehicles.

The contract includes ground and test flight engines. It continues work that began on June 2, 2006, under a preliminary letter contract with Pratt and Whitney Rocketdyne.

NASA awarded the cost-plus-award fee contract to Pratt and Whitney Rocketdyne on a sole-source basis, NASA determined that no other existing capability meets its architecture requirements and is able to be extended to future exploration missions to the moon and beyond.

The contract performance period extends through Dec. 31, 2012. Engines for operational missions will be purchased through a separate contract.

The J-2X is an evolved version of two historic predecessors: the powerful J-2 engine that propelled the Apollo-era Saturn IB and Saturn V rockets, and the J-2S, a simplified version of the J-2 that was developed and tested in the early 1970s. Pratt and Whitney Rocketdyne designed and developed both the J-2 and the J-2S and has been responsible for producing, refurbishing and improving them. The J-2X engine will incorporate significant upgrades to meet higher performance and reliability requirements for the Ares vehicles.

Ares I is an in-line, two-stage rocket that will transport the Orion crew exploration vehicle to low Earth orbit. Orion will accommodate as many as six astronauts. The first stage will consist of a single reusable solid propellant rocket booster similar to those used on the space shuttle, with an additional fifth segment. The second, or upper, stage will consist of a J-2X liquid oxygen- and liquid hydrogen-fueled main engine and a new upper stage fuel tank.

Ares V will enable NASA to launch a variety of science and exploration payloads, as well as key components needed to go to the moon and later to Mars. Ares V, a heavy lift launch vehicle, will use five RS-68 liquid oxygen- and liquid hydrogen-fueled engines mounted below a larger version of the space shuttle's external tank and two five-segment solid propellant rocket boosters for the first stage. The upper stage will use the same J-2X engine as the Ares I.

The J-2X upper stage engine is managed by NASA's Marshall Space Flight Center in Huntsville, Ala., for NASA's Constellation Program.