Spaceflight Now Home



Spaceflight Now +



Premium video content for our Spaceflight Now Plus subscribers.

Atlas 5 launches ASTRA
The Lockheed Martin Atlas 5 rocket blasts off with the European ASTRA 1KR television broadcast satellite right on time April 20 from Complex 41 at Cape Canaveral Air Force Station.

 Play video

STS-51A: Daring mission
Soon after the Palapa and Westar communications satellites got stranded in worthless orbits following their deployment from shuttle Challenger in February 1984, planners began devising a rescue mission to launch that November. The STS-51A flight of shuttle Discovery is arguably one of the most daring and complex space missions ever attempted. The crew successfully launched two communications satellites and then retrieved Palapa and Westar during extraordinary spacewalks using jet-propelled backpacks and hands-on muscle power. Watch the amazing flight unfold with narration by the crew in this post-flight film.

 Small | Medium | Large

Memories of STS-1
In the continuing 25th anniversary celebration of STS-1, this program looks at the engineering challenges behind development of the space shuttle and performing the first flight from Mission Control. This panel includes Milt Heflin, the STS-1 ascent/entry electrical power system flight controller, former space shuttle program manager Bob Thompson, former orbiter project manager Aaron Cohen, Neil Hutchinson, the STS-1 ascent flight director, and astronauts John Young and Bob Crippen.

 Dial-up | Broadband

STS-1 anniversary event
This 25th anniversary celebration of the first space shuttle launch took place April 12 at Space Center Houston. Speakers included Johnson Space Center Director Mike Coats, NASA Administrator Mike Griffin, Congressman Tom DeLay, Senator Kay Bailey Hutchison, STS-1 commander John Young and pilot Bob Crippen.

 Dial-up: Part 1 | Part 2
 Broadband: Part 1 | 2

New lunar mission
During this NASA news conference on April 10, agency officials unveil the Lunar Crater Observation and Sensing Satellite, or LCROSS, that will launch piggyback with the Lunar Reconnaissance Orbiter spacecraft in October 2008. LCROSS will use the launch vehicle's spent upper stage to crash into the moon's south pole in an explosive search for water.

 Dial-up | Broadband

LCROSS mission plan
Daniel Andrews, the LCROSS project manager from NASA's Ames Research Center, narrates this animation depicting the mission from launch through impact on the lunar surface.

 Play video

STS-1 crew looks back
In this highly entertaining program, commander John Young and pilot Bob Crippen of the first space shuttle crew tell stories and memories from STS-1. The two respected astronauts visited Kennedy Space Center on April 6 to mark the upcoming 25th anniversary of Columbia's maiden voyage.

 Dial-up | Broadband

Become a subscriber
More video



Pieces of NASA's next Mars mission are coming together
NASA/JPL NEWS RELEASE
Posted: April 26, 2006

NASA's Phoenix Mars Lander, the next mission to the surface of Mars, is beginning a new phase in preparation for a launch in August 2007.


The Phoenix lander on Mars. Credit: NASA/JPL/LPL
 
As part of this "assembly, test and launch operations" phase, Phoenix team members are beginning to add complex subsystems such as the flight computer, power systems and science instruments to the main structure of the spacecraft. The work combines efforts of Lockheed Martin Space Systems, Denver; the University of Arizona, Tucson; and NASA's Jet Propulsion Laboratory, Pasadena, Calif.

"All the subsystems and instruments from a wide range of suppliers are tested separately, but now we are beginning the vital stage of assembling them together and testing how they will function with each other," said JPL's Barry Goldstein, project manager for Phoenix.

Phoenix will land near the red planet's north polar ice cap to analyze scooped-up samples of icy soil.

"We know there is plenty of water frozen into the surface layer of Mars at high latitudes. We've designed Phoenix to tell us more about this region as a possible habitat for life," said the University of Arizona's Peter Smith, principal investigator for the mission.

Phoenix is the first mission of NASA's Mars Scout Program of competitively proposed, relatively low-cost missions to Mars. The program is currently soliciting proposals for a 2011 Scout mission.

The Phoenix proposal, selected in 2003, saves expense by using a lander structure, subsystem components and protective aeroshell originally built for a 2001 lander mission that was canceled while in development. The budget for the Phoenix mission, including launch, is $386 million.

The spacecraft will land using descent thrusters just prior to touchdown, rather than airbags like those used by the current Mars Exploration Rovers. As Phoenix parachutes through Mars' lower atmosphere in May 2008, a descent camera will take images for providing geological context about the landing site.

The robotic arm being built for Phoenix will be about 2 meters (7 feet) long, jointed at the elbow and wrist, and equipped with a camera and scoop. It will dig as deep as about 50 centimeters (20 inches) and deliver samples to instruments on the spacecraft deck that will analyze physical and chemical properties of the ices and other materials. A stereo color camera will examine the landing site's terrain and provide positioning information for the arm. The Canadian Space Agency is providing a suite of weather instruments for Phoenix.

"The propulsion system and the wiring harness have been added to the vehicle," said Ed Sedivy, Phoenix program manager for Lockheed Martin. "We will be loading flight software onto the flight computer in the next few days. The flight software is much more mature than typical for a planetary program at this stage. As soon as the flight computer is mated up, we can apply external power to the vehicle."

Navigation components, such as star trackers, and communication subsystems will become part of the spacecraft in coming weeks, followed by science instruments in the summer.

Phoenix will be shipped to NASA's Kennedy Space Center, Florida, in May 2007, for final preparations leading up to launch. Before that, testing in Colorado will subject the spacecraft to expected operational environments. This includes thermal and vacuum tests simulating the 10-month trip to Mars and conditions on Mars' surface. Meanwhile, the mission is preparing a test facility in Tucson for practicing and testing procedures for operating the spacecraft on Mars.

JPL, a division of the California Institute of Technology, Pasadena, manages Phoenix for NASA's Science Mission Directorate.