


|
|

Atlas/AEHF launch timeline
BY SPACEFLIGHT NOW Posted: April 23, 2012

| T-00:02.7 |
Engine Start |
| The Russian-designed RD-180 main engine is ignited and undergoes checkout prior to launch. |
|
| T+00:01.1 |
Liftoff |
| The three strap-on solid rocket boosters are lit as the Atlas 5 vehicle, designated AV-031, lifts off and begins a vertical rise away from Complex 41 at Cape Canaveral Air Force Station, Florida. |
|
| T+01:56 |
Jettison SRBs |
| Having burned out of propellant approximately 25 seconds earlier, the spent solid rocket boosters are jettisoned to fall into the Atlantic Ocean. |
|
| T+03:34 |
Nose Cone Jettison |
| The payload fairing that protected the AEHF 2 spacecraft during launch is separated once heating levels drop to predetermined limits. |
|
| T+03:39 |
Forward Load Reactor Jettison |
| The Forward Load Reactor deck that supported the payload fairing's structure to Centaur upper stage is released seconds after the shroud's jettison. |
|
| T+04:18 |
Main Engine Cutoff |
| The RD-180 main engine completes its firing after consuming its kerosene and liquid oxygen fuel supply in the Atlas first stage. |
|
| T+04:24 |
Stage Separation |
| The Common Core Booster first stage of the Atlas 5 rocket separates from the Centaur upper stage. Over the next few seconds, the Centaur engine liquid hydrogen and liquid oxygen systems are readied for ignition. |
|
| T+04:34 |
Centaur Ignition 1 |
| The Centaur RL10 engine ignites for the longer of the two upper stage firings. This burn will inject the Centaur stage and AEHF 2 spacecraft into a parking orbit. |
|
| T+13:57 |
Centaur Cutoff 1 |
| The Centaur engine shuts down after arriving in a planned parking orbit. The vehicle enters a brief coast period lasting nearly 8 minutes before arriving at the required location in space for the second burn. |
|
| T+22:06 |
Centaur Ignition 2 |
| The Centaur re-ignites over the equatorial Atlantic to accelerate the payload into geosynchronous transfer orbit from the parking achieved earlier in the launch sequence. |
|
| T+27:48 |
Centaur Cutoff 2 |
| At the conclusion of its second firing, the Centaur will have delivered the AEHF 2 spacecraft into the targeted orbit with an apogee of 31,070 statute miles, perigee of 140 statute miles and inclination of 21 degrees. |
| T+51:11 |
Spacecraft Separation |
| The U.S. military's second Advanced Extremely High Frequency communications satellite is released into orbit from the Centaur upper stage to complete the AV-031 launch. |

Data source: United Launch Alliance.
|
|
|
|
Final Shuttle Mission Patch

Free shipping to U.S. addresses!

The crew emblem for the final space shuttle mission is now available in our store. Get this piece of history!
U.S. STORE
WORLDWIDE STORE

STS-134 Patch

Free shipping to U.S. addresses!

The final planned flight of space shuttle Endeavour is symbolized in the official embroidered crew patch for STS-134. Available in our store!
U.S. STORE
WORLDWIDE STORE

Ares 1-X Patch
The official embroidered patch for the Ares 1-X rocket test flight, is available for purchase.
U.S. STORE
WORLDWIDE STORE

Apollo Collage
This beautiful one piece set features the Apollo program emblem surrounded by the individual mission logos.
U.S. STORE
WORLDWIDE STORE

Project Orion
The Orion crew exploration vehicle is NASA's first new human spacecraft developed since the space shuttle a quarter-century earlier. The capsule is one of the key elements of returning astronauts to the Moon.
U.S. STORE

Fallen Heroes Patch Collection
The official patches from Apollo 1, the shuttle Challenger and Columbia crews are available in the store.
U.S. STORE
WORLDWIDE STORE
|