Flight 181: Ariane 5/ATV Countdown Timeline
SPACEFLIGHT NOW Posted: March 5, 2008
NOTE: GMT is +5 hours ahead of Eastern Standard Time.
| H-1 Day |
March 8, 2008 |
H-11:30:00 (1633:04 GMT)....Begin final countdown
H-07:30:00 (2033:04 GMT)....Test launcher electrical systems
H-07:30:00 (2033:04 GMT)....Configure first stage for fueling
H-06:00:00 (2203:04 GMT)....Prepare launch pad for final countdown
H-06:00:00 (2203:04 GMT)....Load flight software
H-06:00:00 (2203:04 GMT)....Test radio frequency links
H-06:00:00 (2203:04 GMT)....Align inertial guidance units
H-05:00:00 (2303:04 GMT)....Clear launch pad personnel
H-05:00:00 (2303:04 GMT)....Pressurize ground liquid hydrogen and liquid
oxygen tanks
H-05:00:00 (2303:04 GMT)....Pressurize first and second stage attitude
control systems
H-04:30:00 (2333:04 GMT)....Begin chilldown of ground propellant lines
|
|
| H-0 Day |
March 9, 2008 |
H-04:00:00 (0003:04 GMT)....Load first stage liquid hydrogen and liquid
oxygen
H-03:00:00 (0103:04 GMT)....Begin chilldown of Vulcain 2 first stage main
engine
H-02:00:00 (0203:04 GMT)....Transition to propellant topping mode
H-02:00:00 (0203:04 GMT)....Load final ATV software
H-00:30:00 (0333:04 GMT)....Prepare synchronized launch sequence
H-00:08:00 (0355:04 GMT)....ATV in launch configuration and on
internal power
H-00:07:00 (0356:04 GMT)....Begin synchronized launch sequence
H-00:06:30 (0356:34 GMT)....Terminate propellant topping
H-00:06:30 (0356:34 GMT)....Arm launcher ordnance
H-00:04:00 (0359:04 GMT)....Pressurize first stage liquid hydrogen and
liquid oxygen tanks
H-00:03:30 (0359:34 GMT)....Calculate official launch time
H-00:02:00 (0401:04 GMT)....Open Vulcain 2 bleeder valves and close
chilldown valves
H-00:00:50 (0402:14 GMT)....Switch launcher to on-board power
H-00:00:37 (0402:27 GMT)....Begin automatic ignition sequence and start
on-board recorders
H-00:00:22 (0402:42 GMT)....Activate first stage attitude control system
H-00:00:22 (0402:42 GMT)....Switch launcher to on-board control
H-00:00:06 (0402:58 GMT)....Start hydrogen burn-off igniters and retract
cryogenic umbilical arms
H-00:00:03 (0403:01 GMT)....Switch inertial guidance units to flight mode
H-00:00:02 (0403:02 GMT)....Open launch table water valves
H0 (0403:04 GMT)............Vulcain 2 engine ignition
|

Data Source: EADS Astrium
|
|
|
|
Expedition 20
The official embroidered patch for the International Space Station Expedition 20 crew is now available from our stores.
U.S. STORE
WORLDWIDE STORE

Current Shuttle Mission Patch
The official embroidered patch for shuttle Atlantis' flight to deliver critical spare equipment to the space station.
U.S. STORE
WORLDWIDE STORE



Ares Patch
The Ares Project will develop two new rockets to launch astronauts back to the Moon under NASA's Vision for Exploration. The Ares 1 will employ a single space shuttle solid rocket booster to loft the Orion crew capsule. The gigantic Ares 5 will haul the equipment and cargo needed for such lunar voyages. This is the Ares emblem.
U.S. STORE

One Giant Leap
Hosted by Corbin Bernsen, this award winning documentary marks the 50th anniversary of the U.S. space agency and features exclusive interviews with veteran astronauts.
U.S. STORE
WORLDWIDE STORE

Expedition 21
The official embroidered patch for the International Space Station Expedition 21 crew is now available from our stores.
U.S. STORE
WORLDWIDE STORE
|